• Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
  • Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
  • Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
  • Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
  • Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
  • Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

After-sales Service: Online Services
Warranty: 1 Year
Type: Wheel Excavator
Samples:
US$ 58000/Piece 1 Piece(Min.Order)
| Order Sample
Customization:
Shipping Cost:

Estimated freight per unit.

about shipping cost and estimated delivery time.
Payment Method: visa mastercard discover JCB diners club american express T/T
  Initial Payment Full Payment
Currency: US$
Return&refunds: You can apply for a refund up to 30 days after receipt of the products.
From payment to delivery, we protect your trading.
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos pictures & photos
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
US $55,000-60,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory

Basic Info.

Model NO.
ME75
Usage
Special Excavator, Marine Excavator, Mining Excavator, GM Excavator
Bucket
Grab Shovel
Transmission
Hydraulic Transmission
Drive Type
2 Drive Hydraulic
Bucket Capacity
0.1-0.5
Size
Medium-Sized
Certification
CE, ISO9001: 2000, EPA/Euro 5
Condition
New
After Warranty Service
Video Technical Support/Online Support
Unique Selling Point
Long Lifetime
Product
Custom
Applicable Railway Gauge
1000mm~1435mm
Angle of Rotation
360°
Efficiency
≥40pic/H
Product Use
The Railway Construction
Transport Package
Comply with Export Packaging Requirements Robust a
Specification
6100*2200*2650mm
Trademark
ANT
Origin
Shandong
HS Code
8479109900
Production Capacity
669

Product Description

Factory wholesale Two drive high efficiency railway construction excavator Railway maintenance excavatos !

Home of value that works!

We provide you with the best quality of Small excavators, wheeled excavators, mobile excavators, compact excavators,Electric excavators.

  Long Term Business based on Reliable Partnership 

        RESPONSE  --  QUICK , CORRECT

        PRICE           --  MANUFACTURER BASE

        DELIVERY   --  EASY, CHEAPEST

 Track work Excavator

 

2021 China wholesale Cheap hydraulic 1ton 2ton 6ton 7ton 8ton small excavator with cabin,rubber track can equip with Auger, Wood Grab, Roof, Ripper, Rake, Narrow Bucket, Standard Bucket, Leveling Bucket.

 

 Excavator Photos:,

Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

 

Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance ExcavatosFactory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

Many advantages:
The pillow changing machine produced by our manufacturer on the market is compact in structure, atmospheric in appearance, fashionable and beautiful, more youthful and energetic, light in operation, good in coordination, and very high in work efficiency. Only a small amount of auxiliary work can effectively complete the pillow changing work. It can be installed on the front end of the excavator through the quick change connector. Divided into horizontal type, telescopic type (5 grab, 7 grab, etc.), suitable for 5-16 tons of excavator. After using the strong sleeper replacement machine, the working efficiency can be worth 20 manual workers, and each pillow changing machine can replace 1.5 pillow bars per minute on average, which greatly saves labor.
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

High Capacity RAIL ROAD EXCAVATORS Railway 360 excavator jobs spider excavator railway!
 

 

 

 
 

Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

 

 

 

 

Accessories

You can install more and more accessories to discover more functions of the excavator

 

 

 

 


TOP SELLING  

 

Packaging & Shipping

If you need 1-3 units would be Wooden box, More than 4 units will loading by container

After 5-7 days we will shipping your goods when we received the advance payment.
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

 

 

About us

Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance ExcavatosFactory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos

We offer solutions and services globally in response to diversifying customer challenges and needs.
Through highly engaged employees, we fulfill the needs of our customers and partners with quality products, solutions, and support. We take a lot of pride in our organization and the products we offer, but ultimately, we exist to serve our customers.

 

Contact us
   
   
  
ADD:Jiing 272000 Shandong PR,China
 
FAQ

 

1. Are you original manufacturer?

A: Yes, We will supply you excavator with good quality and competitive price, Also we can supply custom-made service according to your drawings.

 

2. What kind of payment terms can be accepted?

A: Normally we can worked on T/T

 

3. Which incoterms 2010 terms can we work?

A: Normally we can worked on FOB (QINGDAO), CFR, CIF

 

4. What about the delivery time?

A: Within 7-10 days after receiving the deposit

 

5. What about the  warranty time?

A: 1 year or 2000 hours. We shoulder all costs during the warranty period, include the freight.

 

6. What about the Minimum Order Quantity?

A: The MOQ is 1 unit.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

From payment to delivery, we protect your trading.
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos pictures & photos
Factory Wholesale Two Drive High Efficiency Railway Construction Excavator Railway Maintenance Excavatos
US $55,000-60,000 / Piece
Min. Order: 1 Piece
Diamond Member Since 2021

Suppliers with verified business licenses

Secured Trading Service
Manufacturer/Factory
Registered Capital
5000000 RMB
Plant Area
1001~2000 square meters